Package (A):
1) Complete electrical shop drawings of Parachute building and Unit Training Device (UTD).
2) Coordination study and network load flow analysis for the complete air base electrical network.
3) Materials selection according to the US Army Corps of Engineers specifications.
Package (B):![]()
1) Complete electrical design of 22 facility buildings serving the F-16 Air fighter.
2) Design infrastructure network for low voltage and medium voltage network.
3) Calculation sheets for Lightning Risk Assessment calculations, short circuits, voltage drop and selectivity study.
4) Technical support of project execution and materials identification.
5) Coordination drawings of all electrical & Mechanical utilities for all project facilities