CACC – Cairo Cargo Company –Customer Service
EMCB provided all Electrical and Mechanical design documents for CACC Customer Service building.
-
UNION Group Project
Union Group Warehouse at Obour city EMCB provided the following design works: 1) All interior electrical and mechanical documents. 2) All infrastructure mechanical and electrical works. 3) Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations]. 4) Site lighting.
-
Cairo Festival Cimena Complex [CFC] Project (20 Cinema Halls)
EMCB provided the following design works: 1) All interior electrical power, decorative lighting, Cinema operation system equipment control, air condition power. 2) All Fire alarm system, sound system, access control system and low current communication network. 3) Complete design for the main distribution boards and the power feeders network grid for all the building. 4)…
-
Heba Linen Factory Project
Linen Factory at 6th of October city EMCB provided the following design works: 1) All interior electrical and mechanical documents. 2) All infrastructure mechanical and electrical works. 3) Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations]. 4) Site lighting.
-
United Infrastructure Project
Mein River Mini Hydropower Pilot Distribution Network. EMCB provided the following design works: 1) Substation generating plant equipment’s with all network connection. 2) Overhead transmission line 33kV from the generating plant to urban areas of 2500 customer
-
Orascom Companies – ODM sections
MAKADY New town housing – Electrical & Sanitary Design works – Hurgadah
-
Orascom Companies – OHD sections
EMCB provided the following design works: Main 22 KV Switchgear and Transformer substations (22/0.4 KV). 22 KV networks all over new Gouna (2) area. Low voltage network to each villa, town housing units, gulf area, hotels, and mechanical utility
-
Orascom Companies – OHD sections
Six Star Hotel at El Gouna Resort: (2008- 2009) . All interior electrical and mechanical documents. All infrastructure mechanical and electrical works. Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations]. Site lighting.
-
Orascom Companies – OHC sections
Infra structure design documents for Qena GardensProject – 700 Fed. ( 2010 – On going)EMCB provided the following design works:1) Infrastructure design documents for about 700 Acres.Our task includes [22KV Switchgear Buildings, 11KV network,11/0.4 KV Transformer Substations, Low voltage Network,Housing connections, and street lighting].2) Interior Design of Electrical works for all housing units.
-
Orascom Companies – OHC sections
6 October Low Cost Housing [El Haram City]”- (2008- On going) Infrastructure design documents for about 2000 Acres (70 000 land PiEMCBs).