Mein River Mini Hydropower Pilot Distribution Network.
EMCB provided the following design works:
1) Substation generating plant equipment’s with all network connection.
2) Overhead transmission line 33kV from the generating plant to urban areas of 2500 customers.
3) Design distribution transformers to different areas.
4) Network analysis for short circuit and load flow calculation for the whole network.
5) Calculate the sag effect of the overhead transmission lines for the 40 Km distribution network.