
Linen Factory at 6th of October city
EMCB provided the following design works:
1) All interior electrical and mechanical documents.
2) All infrastructure mechanical and electrical works.
3) Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations].
4) Site lighting.
Leave a Reply