Category: Fire Alarm Safety
-
CACC – Cairo Cargo Company –Customer Service
EMCB provided all Electrical and Mechanical design documents for CACC Customer Service building.
-
UNION Group Project
Union Group Warehouse at Obour city EMCB provided the following design works: 1) All interior electrical and mechanical documents. 2) All infrastructure mechanical and electrical works. 3) Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations]. 4) Site lighting.
-
Heba Linen Factory Project
Linen Factory at 6th of October city EMCB provided the following design works: 1) All interior electrical and mechanical documents. 2) All infrastructure mechanical and electrical works. 3) Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations]. 4) Site lighting.
-
Orascom Companies – ODM sections
MAKADY New town housing – Electrical & Sanitary Design works – Hurgadah
-
Orascom Companies – OHD sections
Six Star Hotel at El Gouna Resort: (2008- 2009) . All interior electrical and mechanical documents. All infrastructure mechanical and electrical works. Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations]. Site lighting.
-
HSBC Bank
EMCB provided a site assessment for the fire alarm system and its sequence of operation for both main head quarter at Maadi and the Call Center building at Smart Village
-
US Embassies (through US Company – AICI)
US Embassy Cairo: Provided Electro-mechanical Work Shop Drawings of the Security power System, Communication and control wiring systems for the embassy.