EMCB provided a site assessment for the fire alarm system and its sequence of operation for both main head quarter at Maadi and the Call Center building at Smart Village.
We developed the cause and effect Matrix for both buildings in accordance with the NFPA 72 edition 2016 to validate the fire reaction procedure and fighting consideration for life safety of the occupants and the property.
In addition, we studied the lightning protection and earthing grid for both building and provided site supervision for the contractors executing the recommended fix and the code redesign according to NFPA 780.

Leave a Reply