As the main electrical consulting office for MFO, we provided Electrical Design projects for both North Camp at Arish, (North Sinai) & South Camp at Sharm
El Sheikh (South Sinai).
The Projects implemented by EMCB involved the following:

- Design of Medium Voltage Network for South Camp to replace existing
Diesel Power Plants (through COE) – Year 2001. - Design of Medium Voltage Network for North Camp to replace existing
Diesel Power Plants. - Coordination & Selectivity Studies for Electrical Networks at both North &
South Camps. - Power Factor Correction and Load Reallocation at both North Camp &
South Camp. - Design of 22KV Automatic Voltage Regulator at North Camp.
- Rehabilitation of existing 6.3 KV Switchgear at north Camp.
- Providing new Switch Gear 22 KV at South Camp to replace the old one including the replacement of 10 substations 22/0.4 KV.
- Design of New Substation SS1X at North Camp [2×1000 KVA Transformers].
- Design of New Substation SS11X [500 KVA] and Low Voltage Distribution System.