Wadi Degla Development Company

A) Dar Misr (TIGAN) Project

EMCB provided the following design tasks:
 Preparation of all Electrical, sanitary, mechanical works
for 30 high rise buildings (each 11 floors).
 Preparation of all infrastructure stations and networks for
the compound which includes the following:
 MV Switchgear (11KV) networks and Transformer
Substation 11/0.4 KV.
 LV Networks to all housing, street lighting, and pump
station.
 Communication & TV networks.
 Fire Alarm System Network.
 Sanitary Networks includes Potable water, sewer,
Firefighting and irrigation systems.
 Electrical and mechanical design for Water Pump
station including Potable water pumps, irrigation
pumps and Fire Fighting pumps.


Comments