B) Webster University at Ghana (2014-2015)
EMCB provided all Electrical and Mechanical design documents
for Webster University at Ghana. Our task was as follows:
Electrical Design works:
Lighting & power systems.
Telephone and data systems.
CCTV System.
Security Systems.
Grounding and Lightning protection systems
Transformer Substation (630 KVA- 22/0.4 KV)
Emergency Generator package (500 KW,0.4KV).
Mechanical Design Works:
HVAC system including central, package & split units.
Fire Fighting system.
Water Supply System.
Sewer Drainage System.
Pump Station for water and Fire Fighting systems.
Lift station.